Lower Didessa Medium Hydropower Project - Reconnaissance Study Summary
Project: Lower Didessa Medium Hydropower Project
Location: Ethiopia (Abbay Basin)
Prepared by: Water Works Design and Supervision Enterprise
Date: August 2001
Study Level: Reconnaissance
Project Overview
The reconnaissance study evaluates the feasibility of developing a medium-scale hydropower project on the Didessa River in Ethiopia. The study covers technical, environmental, and socio-economic aspects.
Key Components
Component | Key Findings |
---|---|
Hydrology |
|
Geology |
|
Project Layout |
|
Environment & Socio-Economic |
|
Water Quality |
|
Cost Estimate |
|
Economic Analysis |
|
Key Recommendations
- Further geological surveys needed to assess acidity risks
- Comprehensive vegetation clearing required in reservoir area
- Detailed resettlement action plan needed for affected communities
- Water quality monitoring program essential
- Feasibility study recommended as next step
Conclusion
The reconnaissance study indicates that the Lower Didessa Medium Hydropower Project is technically feasible and economically viable, with an EIRR of 27%. However, environmental and social impacts require careful mitigation measures. The project would contribute significantly to Ethiopia's power generation capacity while requiring substantial investment in infrastructure and community development.