Borkena Irrigation Project Summary
Project Overview
The Borkena Irrigation Project is located in the Borkena Valley (Chaffa Plain) approximately 330 km north of Addis Ababa. Initiated in 1984 following a drought period, the project involves the construction of three dams on the Borkena River to support irrigation development in the valley.
Water Resources
The Borkena River has a catchment area of 465 km² at the Borkena I dam site, with mean annual runoff estimated at 100.0 × 10⁶ m³. Three dams are under construction with the following specifications:
Dam | Height (m) | Storage Capacity (10⁶ m³) |
---|---|---|
Borkena I | 18 | 1.8 |
Borkena II | 31 | 12.0 |
Borkena III | 25 | 6.3 |
Total | 20.1 |
These dams are expected to provide approximately 15.0 × 10⁶ m³ of water for irrigation after accounting for losses.
Crop Water Requirements
The mean annual rainfall is 1,017 mm, with effective rainfall estimated at 630 mm. The project assumes two crops per year (200% cropping intensity) with:
- Supplementary irrigation for maize during the main rain season
- Full irrigation for wheat during the dry season
The estimated crop water requirement is 1,350 mm annually, with a peak requirement of 300 mm in February. Project irrigation efficiency is estimated at 40%.
Design Details
Project Area
The Borkena Valley contains over 10,000 ha of irrigable land, but initial development will be limited to:
- 1,100 ha using water from the three dams
- Potential expansion to 4,000 ha with additional upstream dams
Main Canal
- Mostly unlined with a gradient of 1:2,000
- Maximum capacity: 6 m³/s (peak flow)
- Stage 1 (100 ha): 4,600 m length
- Stage 2 (1,000 ha): 7,400 m total length
Secondary Canals
- 6 secondary canals totaling 10,200 m for 1,000 ha development
- Continuous flow system (24 hours in main canal, 10 hours in secondary canals)
Other Infrastructure
- Drainage: Deep open drains and possible sub-surface drains due to high water table
- Flood protection: Bunds to divert flood waters into Dirma River
- Roads: Permanent river crossing and access tracks
Key Project Statistics
- Mean Annual Runoff: 100.0 × 10⁶ m³
- Potential irrigation water from river: 65.0 × 10⁶ m³
- Reservoir storage capacity: 20.1 × 10⁶ m³
- Available irrigation water from reservoirs: 15.0 × 10⁶ m³
- Total potential irrigable area: 10,000 ha
- Initial irrigable area (3 dams): 1,100 ha
- Potential maximum irrigable area: 4,000 ha