Birete Dam Project Specifications Summary
Project Overview
Project: Birete Dam Project
Prepared by: Ministry of Mines, Energy and Water Resources, Land and Water Studies Agency
Location: Addis Ababa
Date: May 1981
This document contains specifications for the construction of Birete Dam Project, including payment clauses tied to the Bill of Quantities.
Main Specifications Sections
Section A: Environmental Protection
- Landscape preservation requirements
- Prevention of water pollution measures
- Dust abatement procedures
- Costs included in other work items
Section B: Mobilization for Project Construction
- Includes all plant, labor, equipment, materials and services
- Contractor must submit breakdown of lump sum price within 30 days
- Payment covers all mobilization facilities including camps, workshops, and offices
Section C: Diversion and Care of Water During Construction
- Two-stage diversion scheme (dry season construction)
- Includes coffer dams, diversion structure, and gap closure
- Detailed measurement and payment methods for various components
Section D: Excavation
- Classification of materials (Rock, Random Rock, Formation, Earth)
- Excavation methods and requirements
- Rock quarries and transition material quarry specifications
- Earth borrow area operations
- Foundation preparation requirements
Section E: Construction of Earth and Rock Fill
- Material requirements for riprap, rockfill, transition material, and impervious core
- Placement, spreading, and compaction specifications
- Moisture control requirements
- Equipment specifications (vibratory rollers, tamping rollers)
Section F: Concrete, Plain and Reinforced
- Composition and quality requirements
- Cement specifications (British Standard 12:1958 or ASTM C 150-64)
- Aggregate requirements and testing
- Concrete mixing, placing, curing, and finishing specifications
- Formwork and reinforcement requirements
- Measurement and payment methods
Section G: Miscellaneous
- Structural drains installation
- Bulkhead gates and trash rack specifications
- Material and workmanship requirements
Key Material Specifications
Riprap Material Gradation
Material Size | Percent Finer By Weight | Average Weight |
---|---|---|
70 cm | 100 | 175 kg |
60 cm | 80-90 | 110 kg |
15 cm | 10-20 | 10 kg |
8 cm | Not exceeding 10 | 1 kg |
Rock-fill Material Gradation
Material Size | Percent Finer By Weight |
---|---|
30 cm | 100 |
No. 4 sieve (4.75mm) | Not exceeding 25 |
No. 200 sieve (0.074mm) | Not exceeding 5 |
Transition Material Gradation
Material Size | Percent Finer By Weight |
---|---|
8 cm | 100 |
2 cm | 50-80 |
No. 4 sieve (4.75mm) | 25-50 |
No. 200 sieve (0.074mm) | 5-15 |
Measurement and Payment Highlights
- Mobilization (Item 101) - Lump sum payment
- River Diversion (Item 102) - Unit measurement
- Clearing/Stripping (Items 103-a, 104-a, 201) - Per square meter
- Excavation (Items 103-b, 202-204) - Per cubic meter by material type
- Dam Fills (Items 301-306) - Per cubic meter by zone/material type
- Concrete Work (Items 401-407) - Various measurement methods