The Birete Dam Project is located in the Shoa administrative region, approximately 106 km northwest of Addis Ababa, Ethiopia. The dam is planned to conserve surface runoff to meet water requirements for a proposed cement factory.
Key Details:
The study analyzed water availability using mass curve analysis with two scenarios:
The analysis showed sufficient water availability to meet current and projected demands.
The recommended design is a 20.5m high dam with 3.0 × 10⁶ m³ total storage.
Multiple methods were used to estimate design flood peaks:
The spillway was designed with:
The hydrological study confirms the feasibility of the Birete Dam Project to meet the water requirements of the cement factory. The recommended design includes:
Note: The study acknowledges limitations due to scarce data and recommends caution when applying these findings to other basins.