Project: Birete Dam Project - Design of Diversion Structure
Author: Nafis Ahmad, UN Engineering Adviser
Date: August 1980
Location: Ethiopia (UNDP Project ETH-75/005)
Abstract: The report covers the diversion scheme proposed for the Birete Dam project, including hydraulic and structural design of the conduit and details of inlet and outlet structures.
The diversion structure is designed to:
For 25-year flood (64 m³/sec):
For 5-year flood (40 m³/sec):
Two sections analyzed: