The document presents a comprehensive study on gully erosion treatment in five woredas (districts) within the Tana Beles Integrated Water Resources Development Project (TBIWRDP) area in Ethiopia. Gully erosion is identified as a major threat to agricultural lands, infrastructure, and aquatic ecosystems in the region.
The study employed a comprehensive approach to gully assessment and treatment design:
Five model gully watersheds were selected across two zones in Amhara Region:
Three methods were compared for peak flood estimation:
Check dams as primary intervention, with design specifications: