Beko-Abo Multipurpose Project Pre-Feasibility Study Summary
Project Overview
Project Name: Beko-Abo Multipurpose Project
Location: Ethiopia (Blue Nile River basin)
Client: Ministry of Water and Energy, Federal Democratic Republic of Ethiopia
Report Date: November 2010
Consultants: NORPLAN-NORCONSULT-EDF-SCOTT WILSON JV in association with Shebelle Consult PLC and Trepics Consulting Engineers
Project Components
Component | Description |
---|---|
Dam Structure | RCC (Roller Compacted Concrete) dam with spillway, diversion culverts, and intake structure |
Reservoir | Detailed plans showing elevation-area-volume curves and catchment area |
Power Station | Underground powerhouse cavern with machine floor, generator floor, and turbine floor |
Waterways | Northern and southern waterways with headrace tunnels and tailrace tunnels |
Transmission System | 400kV and 500kV switchyard layouts, transmission line routes to Debre Markos and Mandaya |
Key Technical Specifications
- Dam Height: Approximately 200m (from foundation to top dam at EL 1064.5)
- Spillway Capacity: Design flood Q=1826.0 m³/s, PMF Q=16960 m³/s
- Powerhouse: Underground cavern with multiple levels (Machine Floor at EL 788.65, Generator Floor at EL 783.15, Turbine Floor at EL 777.25)
- Transmission: Proposed 400kV and 500kV lines connecting to national grid
Document Structure
Volume | Contents |
---|---|
Volume 2 (This document) | Project Drawings including:
|
Volume 3 | Supporting Overview (technical details) |
Volume 4 | Global Environmental and Socio-economic Assessment |
Key Drawings Included
- Catchment Area and Project Location
- Reservoir Plan and Longitudinal Section
- Dam and Spillway Layout
- Power Station Layout
- Intake Structure and Gate Chamber
- Powerhouse Cavern Cross Sections
- Principal Single Line Diagram
- Switchyard Layouts (400kV and 500kV)
- Transmission Line Route Maps
- Geological Map
- Construction Schedule
- Internal Road Locations
Project Location Context
The project is located on the Blue Nile River in Ethiopia, downstream of Lake Tana and Tissisat Falls. The surrounding area includes several other rivers and dams in the Blue Nile basin including:
- Beshilo River
- Guder River
- Finchaa River
- Mandaya Dam
- Didessa River
- Dabus River
Access and Infrastructure
The study includes detailed plans for:
- Internal roads within the project site
- Access tunnels to various facilities
- Alternative access roads from Kuch to Bridge Abay and from Inewind to Bure Road
- Permanent and temporary access routes