Baro-Akobo River Basin Master Plan Meeting Minutes
Document Overview
Minutes from the September 19-20, 1996 meeting reviewing the Interim Report for the Baro-Akobo River Basin Integrated Water Resource Development Master Plan Project.
Location: Central Showa Hotel and Ministry of Water Resource Conference Hall
Attendees: 28 National Steering Committee Members from 5 Ministries, 13 Authorities, and 2 Regional States
Key Discussion Areas
- Natural Resources: Land evaluation, geology, minerals, forestry, wildlife, tourism, and renewable energy
- Agriculture: Soils, land evaluation, and crop production
- Water Resources: Climatology, hydrology, flood studies, groundwater, reservoir operations, and hydropower
- Socio-Economics: Population aspects, ethnic group analysis, infrastructure
- Environment: Public participation, health considerations, development impacts
- Master Plan Development: Scenarios, project selection criteria, implementation strategies
Major Resolutions
- Consultants agreed to incorporate most steering committee comments in the final report
- Need for improved data quality and consistency across studies
- Requests for more detailed project analyses and justification of assumptions
- Emphasis on including health and environmental impact assessments
- Concerns about drastic reduction in irrigation potential (from 501,254ha to 76,300ha)
- Need for better integration between sectors in development scenarios
Next Steps
- Consultants to prepare Draft Master Plan Report incorporating agreed changes
- Address data gaps and inconsistencies in final report
- Provide more detailed justification for project selections and scenarios
- Include comprehensive environmental and health impact assessments
- Develop implementation strategies for the master plan