Ayisha

awash river basin flood control and watershed management study project phase 3 amibara irrigation project feasibility report (2)

awash river basin.flood control.phase 2 summary report.volume 1

proposed restructuring of awash basin.agency volume 1

studyandidentificationofengineeringstructuresforfloodcontrolinawashriverbasin

proposed restructuring of awash basin agency volume 2 rrr

assessment of problem of sedimentation .of dams reservoirs and river and proposals for remedial measures in the awash river basin

awash river basin flood control and watershed management study project inception report

awash river basin flood control.and watershed managment study project

awash river basin.flood control and watershed management study project

ASSESSMENT OF WATER QUALITY CHANGES IN AWASH RIVER JUNE 2005

awash river bas8n flood contol and wareshed managment study project working papet 1

SomeAspectsofPlanningtheDevelopmentoftheRiverAwashBasinwithParticularEmphasisontheManagementandOptimisationofWaterResources

Awash Valley Authority, Maro Gala Feasibility Study.

Awash Valley Authority, Maro Gala feasibility Study, Terms of Reference

Development of the AwashValley Phase111

Awash Valley Authority, Maro Gala Feasibility Study

Hydrometry and Water balance of Awash River, ANNEX 4-6

Master Plan for the Development of Surface Water Resources in the AwashBasin, Volume VIII, Annex I,J

ReportonSurveyoftheAwashRiverBasinVolumeV

Awash Valley Authority feasibility Study, IV Sociology

ReportonSurveyoftheAwashRiverBasinVolumeIV

Awash Valley development

Feasibility Study of the Lower Awash Valley Part 1 ANNEX 4

Awash Valley Authority, Tender for the techenical feasibility study of the Meki-River Diversion Project

Feasibility Study of the Lower Awash Valley Part II

Awash Valley Authority feasibility Study, VI Irrigation

Awash Valley Authority, Tibila Area Feasibility Study, VII Economy

Awash Valley Authority, Tibila Area, II Hydrogeology

Awash Valley Authority, Tibila Area Feasibility Study, III Soils

Awash Valley Authority, Tibila Area, V Agriculture and Livestock

Awash Valley Authority, Tibila Area Feasibility Study, I General report

Awash River Basin in the Federal Democratic Republic of Ethiopia, Data Book

Awash River Basin In the Federal Democratic Republic of Ethiopia, Geological and Hydrological Maps

Feasibility Study Proposals and Estimates of Cotton Development on the Area of 60.0 THS. Ha In the Lower Awash ValleyBook 2

Feasibility Study of the Lower Awash Valley Part I ANNEX 5

TheProjectforGroundwaterResourcesAssessmentintheMiddleAwashRiverBasinintheFederalDemocraticRepublicofEthiopiaFinalReport

DevelopmentOfTheAwashValley PhaseIII Ethiopia

ReportonSurveyoftheAwashRiverBasinVolumeIII

DevelopmentoftheAwashValleyPhase111

Feasibility Study of the Lower Awash Valley Part I Annex 7

Awash Valley Authority, A Report on the Amibara 1973 Extension Programme

TheProjectforGroundwaterResourcesAssessmentintheAwashRiverBasinintheFederalDemocraticRepublicofEthiopia.

Master Plan for the Development of Surface Water Resources in the Awash Basin,Volume 8; Annex I,J

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 4; Annex A; Climateand Hydrology

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 9

Master Plan for the Developmentof Surface WaterResourcesinthe Awash Basin, Volume 9; Annex K,L,M,N

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 2

Catchment-Scale Hydrological Regimes Response to Landscape-Climate Descriptors in Awash River Basin Ethiopia

Awash Valley Development Agency, The Study of Beseka Lake Levels

Feasibility Study of the Lower Awash Valley Final ReportPart I

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 11, Annex Q,R

ReportonSurveyoftheAwashRiverBasinVolumeII

TheProjectforGroundwaterResourcesAssessmentintheMiddleAwashRiverBasinintheFederalDemocraticRepublicofEthiopia

Feasibility study of the Lower Awash Valley Interim Report

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 3

Awash Valley Development Agency Amibara Irrigation Project II

Feasibility study of the Lower Awash Valley Part I ANNEX 2 Climate and Hydrology

Feasibility study of the Lower Awash Valley Part IANNEX 1 Soils and Land Classification

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 10, ANNEX O,P

Master Plan for the Development of Surface Water Resources in the Awash Basin, Volume 6, ANNEX D,E

Master Plan for the Development of Surface Water Resources in the Awash Basin Volume 1; Executive Summary

MasterPlan for the Developmentof Surface Water Resources in the Awash Basin, Volume 5, ANNEX B,C

Master Plan for the Development of Surface Water Resources in the AwashBasin, Volume7, ANNEX F,G,H

Awash Valley Authority, Appendix A (2)

Awash Flood (2) R

TOPOGRAPHICSURVEYOFLOWERAWASHVALLEYLOGIYATOLAKEGAMARIDECEMBER

BechoPlanReclamation,AwashRiverBedImprovementDownstream

DRAINAGEOFTHEMELKASADIANDAMIBARA AREASINTHEMIDDLEAWASHVALLEYMAY1986

AWASH VALLEY AUTHORITY FEASLBLITY STUDY OFTHE TLBILA AREA

Becho Plan Reclamation, Awash River Bed Improvement (Downstreamof Teji Bridge)

Master Plan for the Development of Surface Water Resources in the Awash Basin, EVDSA Archives

Awash Valley Authority, Appendix A

Master plan for the devlopment of surce water -resources in the awash basin volumes X-compressed2

Awash river basin flood control and watershed management study project phase III

Awash river basin flood control and watershed management study project phase

awash river basin flood control and watershed management study project phase III report 02

awash river basin flood control and watershed management study project phase III report 02 (2) R

Awash river basin flood control and watershd nanagement study project phase 2 volume (2)

Awash river basin flood control and watershd nanagement study project phase 2 volume

awash valley authory ethlopla angelele and bolhmo

awash river basin flood control and watershed management study project working paper 6

awash river basin flood control and watershed management study project phase III amibara irrigation project feasib ilt study main report (2)

awash river basin flood control and watershed management study project phase III amibara irrigation project feasib ilt study main report

AwashRevierBasinPhaseIIIFeasibilityReportFor UpperKesemWatershed ManagementProjectlivestockProduction2008

Awash river basin flood control and watershed management study project dira dawa

Awash river basin flood control and watershed management study project dira dawa (2) R

awash river basin flood control and watershed management study project phase III mojo badlands rehabilition feasibllity report

awash river basin flood control and watershed management study project phase III mojo badlands rehabilition feasibllity report (2)

awash river basin flood control and watershed management study project phase III dire dawa flood mitigation project report 09

awash river basin flood control and watershed management study project phase III dire dawa flood mitigation project report 09 (2)

master plan for the development of surface water resources in the awash basin volume III

master plan for the development of surface water resources in the awash basin volume III (2)

awash river basin flood control and watershed management study project inception report

awash river basin flood control and watershed management study project inception report (2)

awash river basin flood control and watershed management study project phase 3 supplementary report 04

Awash river basin flood control and watershed Management study project phase 3 including dirde dawa

awash river basin flood control and watershed management study project working paper1 (2)

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT BASELINE REPORT 2

AWASH RIVER BASIN FLOOR CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT WORKING PAPER3

awash river basin floox control and watershed management study project phase 3 supplementary report 02 (2)

awash revir basin flood control and watershed management study project working paper4

awash river basin flood control and watershed management study phase 3

Awash diver basin flood control and watershed management study project. working paper4

awash valley development agency

awash valley development agency the study of beska lake levels

awash river basin flood control and watershd management study project phaseI II

awash river basin flood control and watershed Management study project pbase 3 includ 2 dire dawa (2)

awash river basin flood control and watershd management study project phase III3

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT PHASE3 (2)

master planfor the development of surfacewater resources in the Awash basin volume1 (2)rrr

Awash river flood control Watershed management study project phase3

Awash river basin flood control and watershed management study project phase3 (2) R

Awash riverbasin flood control and watershed management study project pbase 3

Awash river basin flood control and watershed management study project phase 3 (2)

awash valley angelele and bolhamo (2) R

awash river basin flood conlrol and management study project volume 1

Awash river basin flood control and watershed management study project phase 3 (2)

Awash valley angelele and bolhamo

Awash river basin flood control and watershed management study project baseline report 4 (2)

Awash river basin flood control and watershed management study project baseline report 4

master plan forthe development of surface water resource in the Awash basin volume vi

awash river basin flood control and watershed management study project phase 3 amibara irrigation project feasibility report

master plan for the development of surface water resources in the awash basin (2)

awashriverbasinfloodcontrolandwatershedmanagementstudyprojectworkingpaper1compressed

TodayAwashriverbasin flood control and watershed management study project phase32

Master plan for the development of surface water resources in the Awash basin volume 2 (3)

awash river flood control and watershed management study project phase 3 uper kesem reprt 02 (3)

master plan for the development of surface water resources in the Awash basin (2)

master plan for the development of surface water resource in the awash basin volume viii annex i and j (3)

Awash RivER BAsIN FLOoD CONTROL AND WATERSHED MANAGEMENT STUDY PRJECT BASELINE REPORT 4 (3)

Master plan for the Development of Surface Water Resources in the Awash Basin,Inception Report (3)

Feasibility Study of the Lower Awash Valley Draft final Report Part 2 (4)

Awash River Basin, experience in agriculture and area development2

Master Plan for the Development of Surface Water Resources in theAwash Basin Draft final Report, Volume VIII,ANNEX I, ANNEX J (3)RRR

Awash river basin flood control and watershed management study project working paper 2 (2) R

Awash river basin flood control and watershed management study project baseline report 6 (2)

Awash river basin flood control and watershed management study project phase I III (2)

awash valley development agency (2) R

master plan for the development of water resources in the awash basin

awash basin .water resources study (2) R

awash river flood control and watershed management study project phase 3 uper kesem reprt 02 (1)

awash river basin flood control and watershed management study project phase 2 volume 2

Awash RivER BAsIN FLOoD CONTROL AND WATERSHED MANAGEMENT STUDY PRJECT BASELINE REPORT 4

master plan for the development of surface wager resources inthe Awash basin volume iv

master plan for the development of surface water resources in the Awash basinrrrr

Master plan for the development of surface water resources in the Awash basin volume 2

master plan for the development of surface water resource in the awash basin volume viii annex i and j

TodayAwashriverbasinfloodcontrolandwatershedmanagementstudyprojectphase3

Master Plan for the Development of Surface Water Resources in the Awash Basin, Draft final Report, Volume VIII, ANNEX I, ANNEX J

Master planfor the Development of Surface Water Resources in the Awash Basin Inception Report

Feasibility Study of the Lower Awash Valley Draft final Report Part 2

Awash River Basin, experience in agriculture and area development

Master Plan for the Development of Surface Water Resources in the Awash Basin Draft final Report, Volume VIII, ANNEX I, ANNEX J (2)

Master plan for the Development of Surface Water Resources in the Awash Basin, Inception Report (2)

Feasibility Study of the Lower Awash Valley Draft final Report Part 2 (2)

GEVERNMENT OF ETHIYOPIA AWASH VALLEY DEVELOPMENT AGENCY AMIBARA PROJECT IMPLEMENTATION

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT BASELINE PROJRCT 2

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT PHASE III4

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT VOLUME 2

AWASH RIVER BASIN FLOOD CONTROL AND WATERSHED MANAGEMENT STUDY PROJECT

problem idntification works to be done on the awash river flood protection dike at metahar sugr factory

Master plan for the devlopment of surce water resources in the awash basin volumes X

Master plan for the devlopment of surce water resources in the awash basin volumes X-compressed (2)

Master plan for the devlopment of surce water resources in the awash basin volumes X-compressed

Awash river basin modelling

Awash river basin modelling-compressed (2)

Awash river basin modelling-compressed

AwashRivERBAsINFLOoDCONTROLANDWATERSHEDMANAGEMENTSTUDYPRJECTBASELINEREPORT42

awash river basin flood control and watershed management study project working paper2-compressed (2)

awash river basin flood control and watershed management study project working paper 2-compressed

awash river basin flood control and watershed management studyproject working paper 1-compressed

awash river basin flood control and watershd management study project working paper 5

awash river basin flood control and watershd managemen t study project working paper 4

awash river basin flood control and watershd management study project working paper 4-compressed2

awash river basin flood control and watershd management study project working paper 4-compressed2 (2)

awash river basin flood control and watershd management study project report 2 volume 12 (2)

awash river basin flood control and watershd management study project phase III2

awash river basin flood control and watershd management study project phase III amibara irrigation project supplment report 05 crop production-compressed2

awash river `basin flood control and watershd management study project phase IIIamibara irrigation project supplment report 05 crop production

awash river basin flood control and watershd management study project phase IIIamibara irrigation project supplment report 05 crop production-compressed

awash river basin flood control and watershd management study project phase III

awash river basin flood control and watershd management study project phase III-compressed

awash river basin flood control and watershd management study project phase III including dire dawa

awash river basin flood control and watershd management study project phase III including dire dawa-compressed

awash river basin flood control and watershd management study project phase III fesiblity report for amibara irrigation project

awash river basin flood control and watershd management study project phase III fesiblity report for amibara i rrigation project-compressed

awash river basin flood control and watershd management study project phase III amibara irrigation project report 10

awash river basin flood control and watershd management study project phase III amibara irrigation project report 10-compressed

MaterplanfortheDevelopmentofSurfaceWaterResourcesIntheAwashBasinDraftFinalReportVolumeVIIFGH1989

AwashRevierBasinPhaseIIIDireDawaFloodMitigationProjectFeasibilityReportSupplemintaryReportAgriculture and Forestery (Including Livestock)FinalReprtApril2008

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash

awash