The Arjo-Dedessa Irrigation Project is a major development initiative in Ethiopia's Abbay Basin (Blue Nile Basin), focusing on water resources development for irrigation purposes. The feasibility study was conducted by the Ministry of Water Resources in association with Water Works Design & Supervision Enterprise and Intercontinental Consultants and Technocrats India Pvt. Ltd.
The Dedessa catchment has a uni-modal rainfall pattern with:
The Dedessa River shows significant seasonal variation:
Flood frequency analysis was conducted using Log-Logistic distribution:
Reference evapotranspiration (ET₀) was calculated using the FAO Penman-Monteith method:
Sediment yield was estimated using the relationship:
Gs = 0.078 Q1.5 (where Gs is sediment load in gm and Q is monthly mean discharge in lt/s/km²)