Arjo-Dedessa Irrigation Project Summary
Project Overview
The Arjo-Dedessa Irrigation Project is a major water resources development in Ethiopia, featuring:
- A 40.6m high rock-fill dam on the Dedessa River (tributary of Abay River)
- Two primary canal systems (Right Bank and Left Bank) totaling 102.98km
- Irrigation command area of 13,665 hectares
- Comprehensive hydraulic structures including regulators, cross-drainage works, and bridges
Key Components
- Dam: FRL at 1356.0m, minimum drawdown at 1350.0m
- Spillway: Ogee crest with chute spillway structure
- Canal Systems: Right Bank (44.166km) and Left Bank (60.18km) primary canals
Canal System Details
Canal | Length (km) | Gross Area (ha) | Culturable Area (ha) | Secondary Canals |
---|---|---|---|---|
Right Bank Primary | 44.166 | 6,827 | 6,215 | 40 |
Left Bank Primary | 60.18 | 10,998 | 7,450 | 45 |
Hydraulic Structures
Control Structures
- Head regulators (76 total)
- Cross regulators (11 total)
- Escape regulators (2 total)
Cross Drainage Works
Type | Right Bank | Left Bank | Total |
---|---|---|---|
Aqueducts | 2 | 4 | 6 |
Siphon Aqueducts | 17 | 16 | 33 |
Canal Siphons | 4 | 2 | 6 |
Bridges
- Road Bridges: 10 total
- Foot Bridges: 3 independent + 14 combined with other structures
Design Parameters
Hydraulic Design Criteria
- Manning's roughness coefficient (n) = 0.0225
- Canal side slopes: 1.5:1 (cut), 2:1 (fill)
- Velocity ratio (V/V₀) maintained between 0.90-1.10
- Critical velocity formula: V₀ = 0.546D⁰·⁶⁴
Sample Secondary Canal System
Detailed planning for sample secondary canals RS-16 and RS-17 includes:
Canal | Length (km) | Command Area (ha) | Discharge (m³/s) | Tertiary Canals |
---|---|---|---|---|
RS-16 | 2.1 | 339.9 | 0.48 | 15 |
RS-17 | 3.0 | 414.75 | 0.58 | 22 |
Key Design Features
- Contour alignment for primary canals
- Flexibility factors incorporated in duty calculations (10-25%)
- Non-scouring, non-silting velocities maintained
- Comprehensive energy dissipation measures
- Detailed scour protection design